Based on sound human resource management and application of related construction machinery, “Genesis” can build standard community for disaster area quickly.
Genesis focuses on the active mobilization of the affected people.After engineering training and participate in the relatively low-tech public facilities and green construction,they can accelerate the forming of community.It's not only use available human resources rationally, but also bring benefits for the affected people and inspire the passion of the people to rebuild their homes.
Why victims are part of the design ? According to a survey, current reconstruction has problems such as complexed process, unobvious region devision, long time-consuming, which causes much potential safety hazard for victims with low skill level entering into reconstruction region. However, Genesis creates a great opportunity for victims participating in reconstruction process. Firstly, its enclosed property and intelligence seperates high-risk house construction with low-tech public and virescence facility construction, enhancing security for participant victims. Besides, Genesis is efficient, which can avoid long-term work of victims. and also, it sufficiently meet victims’ desire to rebuild their hometown.
gLike
Genesis

The problem of post-disaster reconstruction has not been solved properly, since it takes long time and is expensive. Genesis is a system for the post-disaster rapid reconstruction, with the feature of recycling construction waste materials and reconstruction. By using the most advanced Contour Crafting technology, Genesis is able to quickly build houses which meet 10 years living demand. By using Genesis, construction waste materials cleared up from the site of ruins can be made into 3D print materials, achieving the purpose of full use of resources and reduction of land consumption. In addition, Genesis focuses on the active mobilization of the aff¬ected people. Through engineering training and participation in the relatively low-tech public facilities and virescence construction, they can accelerate the reconstruction of community. It not only uses available human resources rationally, but also brings benefits for the a¬ffected people and inspire their passion to rebuild their home.