The Balay Co Urgello Nearing its completion. This is pictured around December 2024 where the 7th floor is the only floor left for completion.
The very first Generated study of Balay Co.
First Generation Balay Co explorative Study.
First Generated Study Balayco
Balayco Perspective evolutional study.
The ground breaking ceremony with the owners, the contractor and the Structural Engineer.
Balay Co Left Side View
Balay Co front-left side view
Balay Co Facade
Balay Co @ 90 percent completion. The scaffoldings of the 7th floor still visible as its is still in construction period.
Balay Co sometime October 2024.
Balay Co Digital perspective worms eye view.
Balay Co typical interior module.
Each Room is equipped with its own T&B with hot and cold water.
The fire pump system of Balay Co located at the Ground floor powering 66 units of dormitory rooms.
Balay Co: A Modern Brutalist Contemporary Dormitory building. 66 rooms, 1 PWD room, Hybrid Grid and Solar powered.