CNC machined wooly mammoth headtube badge (bike is nicknamed Wooli).
CNC machined seat stay bridge.
Bottom bracket weld to front triangle.
Seat stay welds.
Fully welded up frame! Next was to add al the cable and water bottle bosses.
Hanging frame while I sprayed clear coat.
Fully loaded bike on my Peru trip.
gLike