Cafe in main Lobby. Ida Torres 2012.
Cafe. Ida Torres 2012.
Cafe. Ida Torres 2012.
Cafe, lower level. Ida Torres 2012.
Gallery. Ida Torres 2012.
Gallery (view from double-height space). Ida Torres 2012.
Studio communal space. Ida Torres 2012.
Studio. Ida Torres 2012.
Final Submission Board 1 (research and analysis)
Final Submission Board 2 (research transition into design proposal)
Final Submission Board 3 (design proposal floor plans)
Final Submission Board 4 (Cafe/Gallery design proposal)
Final Submission Board 5 (Student Studio design proposal)
gLike
Design Proposition 2012 | NJIT School of Art & Design

This Project was a proposal for the university of NJIT to move the School of Art & Design into the recently acquired Central King Building in Newark, NJ. This project involved an on-site tour for site analysis, analyzing the four major programs within the School, as well as faculty, and planning a layout for the programs that would encourage collaboration. This building would also house various workshop space, as well as on-site amenities to encourage a socializing atmosphere, with each other, as well as other schools on campus.

The focus of design for this building is the Cafe and Gallery space, as well as a selected studio space. Sustainability is also a key factor in the design, some examples are: re-use of materials and energy efficient methods by following the guides of the original architecture.

View Website
Ida Ively ...
Preconstruction Manager | Design & Production Project Management Clifton, NJ