Phase 12-South Pars Gas Field Development Projects , EPC, 4 Billion $
Pipe Racks of Export Gas Unit Piping Operating Weight for Each Part = 1000 Ton
Pipe Rack Elevation
View PDF
Equipment Structure ST-3-101-101 Supports 4 ex-changers and 1 drum with total operating weight 500 Ton Steel weight = 100 Ton
Equipment Structure ST-3-108-401 Supports 4 reactors and 5 ex-changers with total operating load 1500 Ton Steel weight= 300 Ton
Framing Plan of Equipment Structure ST-3-108-401
View PDF
Ex-changer on Equipment Structure
Anchor Bolts of Vertical Equipment Foundation
Equipment Foundation
View PDF
Plate Girder with two different sections for supporting equipment saddle
Plate Girder with two different sections for supporting equipment saddle
View PDF
Equipment Structure ST-3-108-401
Equipment Structure ST-3-101-101
Framing Plan of Equipment Structure ST-3-101-101
View PDF
Piping Loop on Pipe Rack
Gusset Plate of Vertical Brace
Horizontal Reactor on Equipment Strucure
Equipment Structure ST-3-108-601 which supports huge ex-changer with 300 Ton operating weight
Equipment platform on equipment structure
Pipe Support on Equipment Structure
Release Valve Support Horizontal load = 8 Ton
Unit 101
Base Plate Before Grouting
Bridge
Unit 101
Unit 108
Blast Proof Substation Building
gLike
Phase 12-South Pars Gas Field Development Projects , EPC, 4 Billion $

Gas Field Development Phase 12 project was EPC project and performed in Asaluye in south of IRAN. The Project commenced in January 2010 and completed in March 2013.
Mentioned one was EPC project 4 billion $ and causes to production of following materials:
75,000,000 M3/D Treated Gas
2,210,000 M3/D (1,000,000 T/Y) Ethane (C2)
80,000 BBL/D Gas Condensate
1,050,000 T/Y Liquefied Petroleum Gas (LPG) &
400 T/D Sulfur
It is my honor that I was involved in this Mega Project.

Sam Sarijloo
Structural Engineer - B.Sc,M.Sc,P.Eng. Perth, Australia