-
Manager of Creative Making
Baylor University
Waco, TX
Jan 2022 - Present (2 years 8 months)
-
Program Manager
L3Harris Technologies
Waco, TX
Mar 2020 - Jan 2022 (1 year 10 months)
As a Program Integrator, I was responsible for ensuring efficient communication and cohesion between all of the various groups that come together to build a complete interior: design, engineering, subcontracts, planning, procurement, and manufacturing. I scheduled weekly meetings with each group during which I gathered status reports, issues that could potentially affect schedule, budgetary concerns, and upcoming needs in manpower.
-
Interior / Industrial Designer
L3Harris Technologies
Waco, TX
Jun 2012 - Mar 2020 (7 years 9 months)
As an Industrial/Interior Designer, I am responsible for the design of the aircraft from proposal to completion, including initial bid work and design concept development, including the development of color schemes and material selections. Ensuring that material dye lots match throughout the long duration of the program is an integral aspect of the role. After 2 years working on a large Boeing 747-8 contract, I was promoted to the Lead Designer position on another large aircraft completion. My role as a designer involves countless hours of facetime with both the customer and outside vendors.
-
Operations Supervisor
NRH20 Family Water Park
North Richland Hills, TX
Apr 2004 - Sep 2011 (7 years 5 months)
I led a team of over 100 employees who made up our aquatics, park services and maintenance departments. My responsibilities included hiring, scheduling, in-service training, planning and oversight of team building functions, auditing and, if necessary, remedial training. Through the mentorship of a wonderful manager, I developed leadership skills of my own that have remained with me throughout my career.